Keppel P78 FPSO Topsides Module Transport Project For DONGBANG
Topside Modules of Dongbang were transported from Brazil to Singapore using the Mega Caravan 2 vessel. During this project, we conducted the following engineering tasks.
- Stowage Plan
- Voyage Motion
- Motion Analysis
- Berthing Feasibility
- Loadout Ballast Plan
- Mooring Plan & Analysis