Recent Projects
Vessel Blocks
Ship Block Transportation
Ship blocks were manufactured and then shipped from China to Korea aboard the Mega Caravan 1 vessel. During this process, we undertook the following engineering tasks.
- Loadout/Loadin Ballast Plan
- Departure Condition
- Mooring Plan & Analysis
Petrochemical Storage Tank
3000 m3 Spherical Tank Transportation Project
4 Spherical Tanks (each 470.0 MT) and 47 nos. loose cargoes (Total 694.6 MT) were transported from Vietnam to Taiwan by the Mega Caravan 2 vessel. Our engineers conducted the following transportation engineering for this project.
- Stowage Plan
- Voyage Condition
- Deck Strength Analysis
- UKC Check at POL
- Stern Load-out Ballast Plan
- Stern Load-in Ballast Plan
- Mooring Plan & Analysis for POL
- Mooring Plan & Analysis for POD
RMQC and RTGC Crane
Crane Transportation Project
2 RMQC Cranes (each 2219.49 MT) and 6 RTGC Cranes (each 182.9 MT) were transported from Vietnam to India by the Mega Caravan 2 vessel. Our engineers conducted the following transportation engineering for this project.
- Stowage Plan
- Voyage Condition
- Motion Analysis
- Transom-Quay Collision Check at POL.
- Stern Load-out Ballast Plan
- Side Load-in Ballast Plan
- Mooring Plan & Analysis for POL
- Mooring Plan & Analysis for POD
Offshore Wind Module
Topside Transportation Project
The topside offshore wind module weighing 3732.6 MT was transported from Singapore to the USA by the Mega Caravan 2 vessel. Our engineers conducted the following transportation engineering for this project.
- Stowage Plan
- Voyage Condition
- Motion Analysis
- RAO Calculation
- Load-Out Ballast Plan
- Lift-Off Ballast Plan
- Mooring Plan & Analysis
- Offshore Station Keeping
- Deck Strength Analysis
Onshore Modules
Modules Transportation Project
Three topside Modules and 20 nos. of 40-feet containers were transported from China to Singapore utilizing the Mega Caravan 2 vessel. During this project, we conducted the following engineering tasks.
- Stowage Plan
- Stability Check for Voyage and Departure Condition
- Motion Analysis
- Loading and Discharging Ballast Plan
- Mooring Plan & Analysis at Loading and Discharging Port
- Deck Strength Check
Jackets & Piles
Jacket & Piles Transportation Project
A 4200 Ton OSS Jacket and 8 nos. of Piles were transported from Indonesia to USA Offshore utilizing the Fu Zhou Guo Ji vessel. During this project, we conducted the following engineering tasks.
- Stowage Plan
- Voyage Condition & Departure Condition
- Load-out Ballast Plan
- Load-in Ballast Plan for Lift-off Operation
- Mooring Plan & Analysis at Loading Port
- Motion Analysis & RAO Calculation
- Deck Strength Check for Grillage Reaction Force
- Deck Strength Check for Mooring Point Load
- Transportation Analysis
VLT & Pile Sleeves
VLT & Pile Sleeves Transportation
2 Nos. VLTs & Pile Sleeves were transported from USA to Netherlands in 2 voyages.
- Sea fastening calculations
- Grillage and Seafastening drawings
- Sea-fastening reports: lift-off and roll-on
Monopiles
Monopile Transportation Project
44 Nos. Monopiles were transported from Germany to USA in 8 voyage (6 nos per each shipment)
- Stowage plan & voyage condition
- Sea-fastening design
- Mooring plan & analysis
- Ballast plan for both loading and discharging
- Motion analysis
- Insertion analysis
Onshore Modules
Topsides Modules Transport Project
Topside Modules were transported from Brazil to Singapore using the Mega Caravan 2 vessel. During this project, we conducted the following engineering tasks.
- Stowage Plan
- Voyage Condition
- Motion Analysis
- Berthing Feasibility
- Loadout Ballast Plan
- Mooring Plan & Analysis
Jacket
Jacket Transportation Project
Jackets and Boat landings for a wind turbine project are being transported from Oman to Saudi Arabia aboard the Mega Caravan 2 vessel. Our engineering team has been involved in the following tasks.
- Stowage Plan
- Voyage Condition
- Mooring Plan & Analysis
- Structural Analysis
- Loadout Ballast Plan
- Pre-heeling Condition
- Motion Analysis
- Port Entry Plan
- Transportation Analysis
Jackets & Piles
Jackets & Piles Transportation Project
Offshore Platform Jackets and Plies were transported from Vietnam to Qatar via the Mega Caravan 2 vessel. Our engineering responsibilities encompassed the following tasks.
- Stowage Plan
- Voyage Condition
- Loadout/Loadin Ballast Plan
- Pre- Heeling Condition
- Port Entry Plan
- Motion Analysis
- Transportation Analysis
Hydrogen Plant Module
Hydrogen Plant Module Sea Transportation
The hydrogen plant modules were transported to Singapore using the Mega Caravan 2 vessel. Throughout this project, we executed the following engineering tasks.
- Stowage Plan
- Voyage Condition
- Mooring Plan & Analysis