TMS

BD & Korea Image

Recent Projects

Scroll-Driven Animations
Vessel Blocks

Ship Block Transportation

Ship blocks were manufactured and then shipped from China to Korea aboard the Mega Caravan 1 vessel. During this process, we undertook the following engineering tasks.

  • Loadout/Loadin Ballast Plan
  • Departure Condition
  • Mooring Plan & Analysis
Petrochemical Storage Tank

3000 m3 Spherical Tank Transportation Project

4 Spherical Tanks (each 470.0 MT) and 47 nos. loose cargoes (Total 694.6 MT) were transported from Vietnam to Taiwan by the Mega Caravan 2 vessel. Our engineers conducted the following transportation engineering for this project.

  • Stowage Plan
  • Voyage Condition
  • Deck Strength Analysis
  • UKC Check at POL
  • Stern Load-out Ballast Plan
  • Stern Load-in Ballast Plan
  • Mooring Plan & Analysis for POL
  • Mooring Plan & Analysis for POD
RMQC and RTGC Crane

Crane Transportation Project

2 RMQC Cranes (each 2219.49 MT) and 6 RTGC Cranes (each 182.9 MT) were transported from Vietnam to India by the Mega Caravan 2 vessel. Our engineers conducted the following transportation engineering for this project.

  • Stowage Plan
  • Voyage Condition
  • Motion Analysis
  • Transom-Quay Collision Check at POL.
  • Stern Load-out Ballast Plan
  • Side Load-in Ballast Plan
  • Mooring Plan & Analysis for POL
  • Mooring Plan & Analysis for POD
Offshore Wind Module

Topside Transportation Project

The topside offshore wind module weighing 3732.6 MT was transported from Singapore to the USA by the Mega Caravan 2 vessel. Our engineers conducted the following transportation engineering for this project.

  • Stowage Plan
  • Voyage Condition
  • Motion Analysis
  • RAO Calculation
  • Load-Out Ballast Plan
  • Lift-Off Ballast Plan
  • Mooring Plan & Analysis
  • Offshore Station Keeping
  • Deck Strength Analysis
Onshore Modules

Modules Transportation Project

Three topside Modules and 20 nos. of 40-feet containers were transported from China to Singapore utilizing the Mega Caravan 2 vessel. During this project, we conducted the following engineering tasks.

  • Stowage Plan
  • Stability Check for Voyage and Departure Condition
  • Motion Analysis
  • Loading and Discharging Ballast Plan
  • Mooring Plan & Analysis at Loading and Discharging Port
  • Deck Strength Check
Jackets & Piles

Jacket & Piles Transportation Project

A 4200 Ton OSS Jacket and 8 nos. of Piles were transported from Indonesia to USA Offshore utilizing the Fu Zhou Guo Ji vessel. During this project, we conducted the following engineering tasks.

  • Stowage Plan
  • Voyage Condition & Departure Condition
  • Load-out Ballast Plan
  • Load-in Ballast Plan for Lift-off Operation
  • Mooring Plan & Analysis at Loading Port
  • Motion Analysis & RAO Calculation
  • Deck Strength Check for Grillage Reaction Force
  • Deck Strength Check for Mooring Point Load
  • Transportation Analysis
VLT & Pile Sleeves

VLT & Pile Sleeves Transportation

2 Nos. VLTs & Pile Sleeves were transported from USA to Netherlands in 2 voyages.

  • Sea fastening calculations
  • Grillage and Seafastening drawings
  • Sea-fastening reports: lift-off and roll-on
Monopiles

Monopile Transportation Project

44 Nos. Monopiles were transported from Germany to USA in 8 voyage (6 nos per each shipment)

  • Stowage plan & voyage condition
  • Sea-fastening design
  • Mooring plan & analysis
  • Ballast plan for both loading and discharging
  • Motion analysis
  • Insertion analysis
Onshore Modules

Topsides Modules Transport Project

Topside Modules were transported from Brazil to Singapore using the Mega Caravan 2 vessel. During this project, we conducted the following engineering tasks.

  • Stowage Plan
  • Voyage Condition
  • Motion Analysis
  • Berthing Feasibility
  • Loadout Ballast Plan
  • Mooring Plan & Analysis
Jacket

Jacket Transportation Project

Jackets and Boat landings for a wind turbine project are being transported from Oman to Saudi Arabia aboard the Mega Caravan 2 vessel. Our engineering team has been involved in the following tasks.

  • Stowage Plan
  • Voyage Condition
  • Mooring Plan & Analysis
  • Structural Analysis
  • Loadout Ballast Plan
  • Pre-heeling Condition
  • Motion Analysis
  • Port Entry Plan
  • Transportation Analysis
Jackets & Piles

Jackets & Piles Transportation Project

Offshore Platform Jackets and Plies were transported from Vietnam to Qatar via the Mega Caravan 2 vessel. Our engineering responsibilities encompassed the following tasks.

  • Stowage Plan
  • Voyage Condition
  • Loadout/Loadin Ballast Plan
  • Pre- Heeling Condition
  • Port Entry Plan
  • Motion Analysis
  • Transportation Analysis
Hydrogen Plant Module

Hydrogen Plant Module Sea Transportation

The hydrogen plant modules were transported to Singapore using the Mega Caravan 2 vessel. Throughout this project, we executed the following engineering tasks.

  • Stowage Plan
  • Voyage Condition
  • Mooring Plan & Analysis